Mandatory Dimensions |
|
These fields serve for the dimension values validation on the personnel dimension.
Example: If the ‘COST CENTRE’ dimension is selected as the ‘Required dimension’, at least one cost centre must be specified for each person. If no cost centre is set up, a corresponding tip is displayed (warning) during wage accounting. |