Project Posting | Line Type Can be Set on Salary Type |
Task #8141 | 5051.100 (SwissSalary NAV-versionen and project)
The per-project posting line type (project item) is now on the salary type. It controls the offsetting of the corresponding services (hours). The following options are available in the new “Job Line Type" field (tab Absences):
- 'blank' (column Line Type is posted 'empty’ in the project items) - Schedule (column Line Type is posted in the project items with the 'plan’ value) - Contract (column Line Type is posted in the project items with the 'contract’ value) - Both Schedule and Contract (column Line Type is posted in the project items with the 'plan and contract’ value) |