EasyRapport Transfer | GroupLine error at period start day 1

Task #12130 | 5062.000

 

EasyRapport Transfer was modified so that the document date is read for each wage item and the correct EasyRapport group (with report type) is assigned to it. This means that period start day setup no longer affects wage items that have already been posted.